Basic and Detailed Design of Semi-centralized WWTPs in the State of Rio de Janeiro
—

Client SETEC

Year 2024

Location State of Rio de Janeiro

Scale Municipal and Regional
Basic and detailed process and hydromechanical design for 13 semi-centralized Wastewater Treatment Plants in three municipalities (Santa Maria Madalena, Sapucaia and São José do Rio Preto) in the State of Rio de Janeiro. The scope included analysis and validation of the design assumptions, definition of the solutions and detailing of the treatment systems, technical drawings, hydraulic profile and layout for each case, design and calculation reports, and the operation & maintenance manual.