Conceptual and Detailed Design of the Bonança Wastewater Treatment Plant
—

Client BRK

Year 2021 - 2023

Location Moreno (PE)

Scale Municipal and Regional
Conceptual and detailed design of the wastewater treatment system in the municipality of Moreno – PE, operated by BRK. This work was carried out with Geasa Engenharia, which was also responsible for the sewage collection and conveyance system. The work involved reviewing and replacing the treatment process, as well as expanding the plant's capacity. The project faced major challenges: a restricted area, a wastewater with a high organic load and the need to keep the existing system in operation during construction of the new one. To that end, the project involved a strategic layout and phasing to ensure continuity of the WWTP's operation. Based on the assessment of solutions, an MBBR system was selected, in a configuration that allows operational changes to increase nutrient removal.